News
Market
Jobs
About
Contact
List Product
Register
Login
Generate
WhatsApp Message
*11 500 Megawatts Required To Achieve Vision 2030 - Chasi* *Follow Pindula on WhatsApp for daily new updates* https://whatsapp.com/channel/0029Va84dngJP21B2nWeyM3v?rd Zimbabwe will need to generate 11 500MW of power for the country to attain an upper-middle-income economy by 2030. This was said by Energy and Power Development Minister, Fortune Chasi, in a speech read on his behalf by his deputy, Magna Mudyiwa, at the on-going Water, Sanitation, Industry and Energy conference in Bulawayo. Said Chasi: ---------- *HOT DEALS:* *itel A70 - (128GB, 3GB RAM) $89,* *itel A70 - (256GB, 4GB RAM) $99* *itel P40 (128GB, 4GB), (6000mAh) $99* *itel P40 (64GB, 4G), (6000mAh) $93* Cash on Delivery in Harare & Bulawayo. Tinotumira kwamuri inosvika. WhatsApp: 0️⃣7️⃣8️⃣3️⃣ 4️⃣5️⃣0️⃣ 7️⃣9️⃣3️⃣ ---------- > I should point out at this juncture that an upper-middle-income society of 2030 is estimated to require about 11 500MW of power. > With the current installed capacity of 2 260MW we have, the work in front of us is really challenging. The country currently has an installed capacity of just 2 260MW, with current generation below 1 000MW. Power imports from South Africa and Mozambique have not been adequate to meet the deficit, forcing the country’s power utility, ZESA Holdings, to implement rolling power cuts across the country. *More: Chronicle* _If you found this article useful_ *Please support Pindula by forwarding to friends and groups*
Copy to clipboard
Give us Feedback
Full Name
WhatsApp Number
Feedback
Submit
Feedback