News
Market
Jobs
About
Contact
List Product
Register
Login
Generate
WhatsApp Message
*Kariba Power Generation Down To 50%* *Follow Pindula on WhatsApp for daily new updates* https://whatsapp.com/channel/0029Va84dngJP21B2nWeyM3v?sc Zimbabwe and Zambia have cut the power generation to around half capacity at the Kariba Hydro-electric power plants as a result of dwindling water levels in the dam. The development was revealed by Zambia Electricity Corporation (ZESCO) spokesperson Henry Kapata. ---------- *Latest itel S24 now available on Pindula* $124 Cash on Delivery in Harare & Bulawayo. WhatsApp: 0️⃣7️⃣8️⃣3️⃣ 4️⃣5️⃣0️⃣ 7️⃣9️⃣3️⃣ ---------- Kapata said that both the Zambian and Zimbabwean sides had been restricted to 500 MW each from total capacities of around 1 000 MW. He said: > The Zambezi River Authority gave us an annual allocation of 19-billion cubic metres of water and this means we can only generate up to 500 MW each. Kariba Dam’s water levels have fallen to 43 per cent of its capacity. *Related:* *Kariba Dam Capacity Drops To 43%. Power Generation Threatened* *More: Engineering News* _If you found this article useful_ *Please support Pindula by forwarding to friends and groups*
Copy to clipboard
Give us Feedback
Full Name
WhatsApp Number
Feedback
Submit
Feedback