Home
About
Contact
Register
Login
Generate
WhatsApp Message
*Harare Council Shuts Down Prince Edward Water Treatment Plant* *Follow Pindula on WhatsApp for daily new updates* https://whatsapp.com/channel/0029Va84dngJP21B2nWeyM3v?uk The City of Harare has shut down the Prince Edward Water Treatment Plant due to depleting raw water levels in two of the city’s water supply dams. In an update today, 07 December, the council said the Prince Edward Water Treatment plant was shut down on 01 December because of depleted raw water in the supply dams of Harava and Seke. Read the update: ---------- itel A70 256GB $99USD WhatsApp: https://wa.me/+263715068543 Calls: 0772464000 ---------- > Prince Edward water treatment plant has been shut down since 2 December 2023 because of depleted raw water in the supply dams of Harava and Seke. > Due to this most of the southern suburbs supplied from P.E. are being affected by the closure of the plant. > These areas include R.G. Mugabe International Airport, Cranborne, and Hatfield, Chitungwiza, Mbare, Sunningdale and Graniteside. > However, some supplies are being received from Warren Control through the interconnector at George Road and Seke Road. > Chitungwiza did not get any supplies over the past 24 hours, whilst Norton received 6 ML. In an earlier update on Tuesday, the local authority said the two dams were at 13.7% (≈ 925 ML) and 13.5% (≈ 516 ML) full, and as a result, the water level in Seke was below the abstraction level. It said: > Although the upstream dams of Dema 1 and Dema 2 were opened on 21/11/23, no significant inflows have been recorded. The closure of Prince Edward comes as Harare is grappling with a cholera outbreak that has claimed several lives. Harare residents are often forced to resort to contaminated sources of water due to the scarcity of the precious liquid. More: Pindula News _If you found this article useful_ *Please support Pindula by forwarding to friends and groups*
Copy to clipboard
Feedback