Home
About
Contact
Register
Login
Generate
WhatsApp Message
*Kariba Power Plant Faces Imminent Shutdown* *Follow Pindula on WhatsApp for daily new updates* https://whatsapp.com/channel/0029Va84dngJP21B2nWeyM3v?yh The Kariba Hydroelectric Plant could be shut down completely by January 2020 due to a fall in water levels, making the little water remaining unusable (dead water). This was revealed by Zambezi River Authority (ZRA) Chief Executive Officer, Munyaradzi Munodawafa, who also said the authority will soon present the figures on the water levels to the government. He said: ---------- itel A70 256GB $99USD WhatsApp: https://wa.me/+263715068543 Calls: 0772464000 ---------- > We could drastically, drastically reduce to the extent of even shutting down Kariba. We are still calculating so that we can present the extent figures to the governments but l do not see anything good coming out. According to latest figures, the water level declined to 476.99m as of the 5th of this month, with the lake designed to operate between 475.50 metre and 488.50 metre levels for hydropower generation. Meanwhile, Zambia’s Minister of Energy, Mathew Nkhuwa said it will take up three years to fill up Lake Kariba provided adequate rains are received. *More: ZBC News* _If you found this article useful_ *Please support Pindula by forwarding to friends and groups*
Copy to clipboard
Feedback